

RECENT PROJECTS - COLLIE AREA (Western Australia).
Western Power invited AVS to evaluate 100 pole structures in the Collie region of Western Australia. The line was a decommisioned 66 kV line - MU-WAG-71.
|
The trial was initated to evaluate the variation between the current dig and drill method and our NDE system. Are tabulated results from the trial were:
Below are the results of the project compared with the industry's 1998 NDE trial. |
|
|
|
|
Note: The results of this trial have been accurately evaluated by AVS from the data. This is not a Western Power report.
| Privacy Policy & Disclaimer | Copyright © AVS Australia Pty Limited. All Rights Reserved |